The best Side of Cast in Situ Piles
As noticed from the determine beneath, continuous auger is used to drill the borehole, lift up drilled soil, and pour concrete while the auger is moved up. Subsequently, the borehole would not will need casing or hydrostatic pressure to avoid harm to the borehole wall.Demolition of the surplus concrete above the Minimize-off level shall be carried